Palm Bay, Margate roof replacement scaffolding
This scaffolding was erected in Palm Bay for the roof to be stripped, new breathable felt, re battened and tiles back on.
The double toe board was used to extra protection for the neighbours down the right and the new laid patio on the front. This scaffold was bearing quite a bit of weight from the tiles so extra fittings called “check” fittings were used to stop the lift from moving/dropping.